本页仅为文字内容,不可回答。

Mitre 10 问卷

这份问卷共有10條選擇題 , 每題必答。请根据题目选出正确答案!
What is the maximum number of items that can be combined into 1 report? 在一个报告中最多可以组合的款式数量是多少?
5 Items 5项
4 Items 4项
3 Items 3项
All items in the PO must be combined into 1 report, unless otherwise instructed by client. PO订单中的所有项目必须合并成一份报告,除非客户另有指示。
15 items only. If more than 15 items, must get office manager approval.仅15项。如果超过15项,必须得到办公室经理的批准。
How should the inspector report the discrepancies for product measurement? 驗貨员应如何报告产品测量的差异?
Put in the Comment without affecting the overall result. Also state the difference compared with which of the client submitted documents.在不影响总体结果的情况下在 Comment 评论发布。同时说明和客户提交的哪一份文件不同。
Issue pending report. 出 Pending 报告。
Put the data in comments and fail the report.把数据写在 comment 里,出 Fail 报告。
None of the above.以上都不是。
What is the difference between a) sample check report and b) inspection general checklist?请问 a) sample check report 和 b)inspection general checklist 有什么区别?
a) and b) are exactly the same, it’s only the name is different.a)和 b)完全一样,只是名字不一样。
b) is used for ceramics only, while a) is for general hard goods.b)仅用于陶瓷,a)用于一般硬制品。
b) is for new SKU items, while a) is for old SKU items.b)用于新的SKU项目,a)用于旧的SKU项目。
a) is mainly for new SKU items, while b) is for all items including new SKU ones.a)主要用于新的SKU项目,b)用于所有项目,包括新的SKU项目。
All of the above. 以上都是。
Where can we find on-site test / function test details?在哪里可以找到现场测试 / 功能测试的详细信息?
API GPS.
Client Inspection General Checklist.
Client Product Specification.
Sample Check Report.
All of the above. 以上都是。
What information must be included for the on-site tests details in the report?报告中必须包括哪些现场测试详细信息?
The weight and time duration of the specific test.具体试验的重量和持续时间。
The number of pieces being tested. 试验件的数量。
The number of cycles being tested (if applicable).试验循环次数(如适用)。
The volume of liquid / water that is used for testing (if applicable).用于试验的液体 / 水的体积(如适用)。
All of the above. 以上都是。
How many pieces per item must be tested for moisture content check?每个款式必须测试多少件以进行湿度试验检查?
1 pc.
3 pcs.
20 pcs.
S-2.
S-3.
What are the procedures for issuing a draft report?发布草稿报告的程序是什么?
Call the client for any fail or pending result during office hour on inspection day.如果有任何 fail 或者 pending的重点 ,验货员 必须在验货当天的办公时间内五点前给客户打电话。
Email the draft report to client and copy AE on inspection day.在验货当天内将草稿报告通过电子邮件发送给客户 , 也请抄送给客服。
Email all the photos together with the draft report to client.请连同全部的fail pending 照片通过电子邮件发送给客户。
If client request to remove any pending findings / remarks, inspector should move these to the comment section of the report, and indicate it was accepted by client. But do not modify any AQL defects (if any).如果客户不同意验货员的判断 , 因此接受部分pending , 验货员 必须将这些评论点从remark更新至报告的comment部分,写下客户接受了这论点(包括客户名称和日期) 。但如果是关于A.Q.L. 质量变更要求,请向客户解释一定不能改变 。
All of the above.以上都是。
For loading weight photos, inspector must:拍照装载重量照片时,驗貨员必须:
Take picture of the product that is fully loaded, and indicate the loading weight plus duration of the test (with result) below the picture description box.拍摄满载产品的照片,并在图片描述框下方注明加载重量加上测试持续时间 (连结果)。
Take picture of the product only.仅对产品拍照。
Include the difference of the weight in the photo.包括照片中重量的差异。
Take a close-view photo of the loading only.仅拍摄装载物的近景照片。
None of the above.以上都不是。
What are the most important requests apart from clear and close-up view of a photo taken?除了拍摄照片的清晰特写外,最重要的照片要求是什么?
The digital readings of weight must be readable in the photo.重量的数字读数必须在照片中可读。
Each photo must include the corresponding SKU item#.每张照片必须包含相应的SKU#。
For dimension measurement, photos must include ruler which is readable in the photo.对于尺寸测量,照片必须包括照片中可读的标尺。
Photos must be precise and clear enough, focus on the defect point with overall and close-up view.照片必须足够精确、清晰,重点放在缺陷点上,全面加特写。
All of the above.以上都是。
What should inspector do if production does not meet 100% produced and 80% packed? 如果生产不足100%和80%的包装,驗貨员应该怎么做?
Issue missing report immediately without any doubt.毫无疑问,立即发 Missing 报告。
Check with AE immediately and wait for client advice what to do next.立即与客服 联系,等待客户建议下一步怎么做。
Check with office manager.与办公室经理核实。
Wait for 2 hours in the factory and leave if production status still not meet.在工厂等待2小时,如果生产状态仍不足,则离开。
Wait in the factory until the production is 100% produced and 80% packed.在工厂等待直到生产达到100%生产和80%包装。
請填寫您的全名
    ____________
手机
    ____________
答题日期
日期    ____________
举报