What is Shaw's position?
Contractor Site Engineer
Environmental Supervision Engineer
Village administrator
Water truck operator
Why does Shaw order to stop construction at once?
Construction workers need a break
Severe dust pollution and village complaints received
The water truck has broken down
All earthwork has been finished
What's Ma's reason for failing to control dust at first?
No money to rent watering equipment
Equipment allocation delay
All drivers are off duty
They forgot environmental rules
When should dust suppression be arranged according to environmental rules?
After all transportation work finishes
Before starting earthwork
Only after villagers make complaints
Every night after construction ends
What official document can Shaw issue for this environmental violation?
Construction acceptance certificate
Non-compliance Notice
Vehicle driving permit
Community feedback form
How much money in US dollars does Ma offer as coordination expense?
10 USD
30 USD
50 USD
100 USD
How long will it take to start watering after their negotiation?
Within one hour
Within thirty minutes
Tomorrow morning
After finishing grading work
What measure is required to cut dust on the haul road?
Cover all soil with plastic cloth
Slow down transport trucks
Block the haul road temporarily
Stop all material transportation
What task will the contractor assign one worker to do?
Drive the water truck full time
Monitor the dust situation on site
Communicate with villagers daily
Write environmental inspection reports
When will the contractor optimize their environmental arrangement plan?
Right away
This afternoon
Starting from tomorrow
After all complaints disappear
判断正误:The complaint from nearby villagers was received in the afternoon.
判断正误:Shaw thinks the 10 USD compensation matches the risk he bears.
判断正误:Halting construction will seriously affect hauling and grading work today.
判断正误:The contractor can continue construction without improving dust control.
判断正误:Environmental protection rules are compulsory for construction sites.