Test Paper 1

Scenario 1: Requirement Clarification & Forward Design Input

Scenario 2: Simulation, Verification & Prototype/Tooling Development


Test Instructions:

1.Total Questions: 50 single choice questions

2.Time Allowed: 60 minutes

3.Full Score: 100 points

Scoring Rules: Q1–50 are 2 point each

* 请填写您的中文姓名
*1. What does LOA stand for in overseas bus projects?
*2. The full name of WBS in project management is ______.
*3. Which of the following refers to the official start of on-site project construction?
*4. "总体进度计划" is correctly translated as ______.
*5. Technical risk assessment should be completed ______ official R&D work.
*6. Which term means the handover of construction land from the client to the contractor?
*7. The word "liaise with" means ______.
*8. "Documentation Clearance" refers to ______.
*9. All project work must be in ______ with technical specifications.
*10. Which of the following is temporary on-site facility?
*11. Digital simulation is mainly used for ______ optimization of bus.
*12. "Bench Test" in bus R&D means ______.
*13. Prototype Vehicle refers to ______.
*14. Tooling development is designed to improve ______ of parts assembly.
*15. Assembly debugging is a key step of ______.
*16. "Dimension Tolerance" controls the ______ of bus parts.
*17. Material environmental adaptability test aims to ______.
*18. Manufacturing Process does not include ______.
*19. Process trial production is implemented before ______.
*20. Assembly accuracy directly affects bus ______.
*21. IQC in supplier management stands for ______.
*22. Closed-loop quality management requires ______ of quality problems.
*23. RCA (Root Cause Analysis) is used to ______.
*24. Technical synchronization with suppliers aims to avoid ______.
*25. Supplier audit is a regular inspection on supplier’s ______.
*26. Overseas regulatory certification is the ______ for bus market access.
*27. The verb "configure" means ______ in vehicle engineering.
*28. PRC in international trade documents refers to ______.
*29. Compliance certificate is used to prove ______.
*30. Technical delivery documents are ______ with finished vehicles.
*31. After-sales technical support for overseas projects usually includes ______.
*32. Fault traceability means ______ operation failure causes.
*33. Closed-loop rectification is used to ______.
*34. Fault location technology helps engineers ______.
*35. Operation & maintenance training is provided for ______.
*36. Which of the following is the correct translation of "围挡"?
*37. "Risk Assessment" means ______.
*38. Temporary building does not include ______.
*39. Vehicle aerodynamic simulation belongs to ______.
*40. Fixture customization is mainly for improving ______.
*41. Material durability test verifies ______ of bus parts.
*42. Batch consistency ensures ______ of mass-produced buses.
*43. Rectification & verification is the final step of ______.
*44. Emission standard certification belongs to ______ certification.
*45. Operation & Maintenance Manual is a kind of ______.
*46. Fault database is used for ______.
*47. Recurrence prevention optimization aims to ______.
*48. The core purpose of project kick-off meeting is to ______.
*49. All on-site activities must be ______ with local regulations.
*50. The full life cycle of bus overseas project does not include ______.