匿名调查,您的意见对我们来说非常宝贵
如果在准备ECR中对选择哪一个条目有困惑,或者讨论中大家的意见不一致,请帮忙完成下面的调查问卷,谢谢!
Line 1: Design change_Changes in the special characteristics of parts, electr. Components, processes, products or Printed Circuit Board agreed with the customer
Line 2 :Design change_E.g. Changes to electrical or hydraulic components, bracket to the vehicle, electrical components or printed circuit boards
Line 3 :Design change_E.g. changes in design, circuit, tooling
Line 4 :Design change_E.g. changes in the software (SW) at the product (parameter, architecture)
Line 5 :Design change_E.g. Changes in a sealing material, change in an EMC capacitor
Line 6 :Design change_E.g. Changes in dimensions that are not included in the customer drawing
Line 7 :Design change_Material changes
Line 8 :Design change_Changes to Bosch specification or changes in tolerance, outside of customer specification
Line 9 :Design change_Changes to Bosch specification or changes in tolerance, within the customer specification
Line 10 :Design change_Changes to the name or description of parts and materials
Line 11 :Design change_Changes in rough machining stages (e.g. pre-turning dimension of a shaft, wafer mounting)
Line 12 :Process change_E.g. Change in the process chain including sub-supplier
Line 13 :Process change_E.g. Change in testing, test procedure or for other reasons
Line 14 :Process change_E.g. Change in the hardness parameters, injection temperature
Line 15 :Process change_E.g. Change in the process chain including sub-suppliers
Line 16 :Process change_Changes in the number of cavities in the tool
Line 16a :Process change_Duplication or replacement of tooling with the same amount of cavities
Line 17 :Process change_Duplication of production and test equipment
Line 18 :Process change_Procurement and use of new machine type
Line 19 :Process change_Change in the existing tool new device , new Poka Yoke
Line 20 :Process change_Change in the process including roughing stages (for example, no. 11)
Line 21 :Process change_Change in the setting parameters (e.g. injection temperature), manufacturing resources (e.g. lubricant)
Line 22 :Process change_Change in the test, risk higher
Line 23 :Process change_Change in testing or test method. Risk unchanged or reduced
Line 24 :Process change_Expansion of the test without changing the method (e.g. increase in random sample)
Line 24a :Process change_Reduction/ cancellation of a not customer relevant testing (e.g. random sample)
Line 25 :Process change_Relocation of Tools within similar lines
Line 26 :Process change_Relocation of non-mobile equipment in a location without changing the process chain
Line 26a :Process change_Relocation of mobile equipment in a location without changing the process chain
Line 27 :Process change_Change in the location, relocation of the equipment, parallel production
Line 27a :Process change_Change in the location, relocation of the equipment, parallel production for roughing stages
Line 28 :Logistics change_New supplier, new sub-supplier-affect contract s(e.g., specification sheet, customer drawing, offer drawing, TCD, data records, specifications, ...) or other serial s provided to the customer (e.g., Control Plan, ...)
Line 29 :Logistics change_New supplier, new sub-supplier-affect fit, form, function, performance, reliability
Line 30 :Logistics change_New supplier, new sub-supplier-no affect
Line 30a :Logistics change_New forwarding agent (carrier), external service provider, internal service provider
Line 31 :Logistics change_Packaging to the customer, shipping, billing
Line 31a :Logistics change_Internal packaging (e.g. plant-plant, within plant,…) and delivered packaging
Line 32 :Documents change_Document adaptation to the condition of the released product
Line 33 :Documents change_Document adaptation to the condition of the released product or correction of formal error (ECR-correction)
Line 34 :Documents change_Change in non-product-related s (e.g. from work instructions, accurate manufacturing instruction)
44题 | 被引用0次