MP308.01-003 Involvement-Matrix not clear line collection

匿名调查,您的意见对我们来说非常宝贵


如果在准备ECR中对选择哪一个条目有困惑,或者讨论中大家的意见不一致,请帮忙完成下面的调查问卷,谢谢!



Line 1: Design change_Changes in the special characteristics of parts, electr. Components, processes, products or Printed Circuit Board agreed with the customer

Clear
Not clear
Depend on case
其他


Line 2 :Design change_E.g. Changes to electrical or hydraulic components, bracket to the vehicle, electrical components or printed circuit boards

Clear
Not clear
Depend on case
其他


Line 3 :Design change_E.g. changes in design, circuit, tooling

Clear
Not clear
Depend on case
其他


Line 4 :Design change_E.g. changes in the software (SW) at the product (parameter, architecture)

Clear
Not clear
Depend on case
其他


Line 5 :Design change_E.g. Changes in a sealing material, change in an EMC capacitor

Clear
Not clear
Depend on case
其他


Line 6 :Design change_E.g. Changes in dimensions that are not included in the customer drawing

Clear
Not clear
Depend on case
其他


Line 7 :Design change_Material changes

Clear
Not clear
Depend on case
其他


Line 8 :Design change_Changes to Bosch specification or changes in tolerance, outside of customer specification

Clear
Not clear
Depend on case
其他


Line 9 :Design change_Changes to Bosch specification or changes in tolerance, within the customer specification

Clear
Not clear
Depend on case
其他


Line 10 :Design change_Changes to the name or description of parts and materials

Clear
Not clear
Depend on case
其他


Line 11 :Design change_Changes in rough machining stages (e.g. pre-turning dimension of a shaft, wafer mounting)

Clear
Not clear
Depend on case
其他


Line 12 :Process change_E.g. Change in the process chain including sub-supplier

Clear
Not clear
Depend on case
其他


Line 13 :Process change_E.g. Change in testing, test procedure or for other reasons

Clear
Not clear
Depend on case
其他


Line 14 :Process change_E.g. Change in the hardness parameters, injection temperature

Clear
Not clear
Depend on case
其他


Line 15 :Process change_E.g. Change in the process chain including sub-suppliers

Clear
Not clear
Depend on case
其他


Line 16 :Process change_Changes in the number of cavities in the tool

Clear
Not clear
Depend on case
其他


Line 16a :Process change_Duplication or replacement of tooling with the same amount of cavities

Clear
Not clear
Depend on case
其他


Line 17 :Process change_Duplication of production and test equipment

Clear
Not clear
Depend on case
其他


Line 18 :Process change_Procurement and use of new machine type

Clear
Not clear
Depend on case
其他


Line 19 :Process change_Change in the existing tool new device , new Poka Yoke

Clear
Not clear
Depend on case
其他


Line 20 :Process change_Change in the process including roughing stages (for example, no. 11)

Clear
Not clear
Depend on case
其他


Line 21 :Process change_Change in the setting parameters  (e.g. injection temperature), manufacturing  resources (e.g. lubricant)

Clear
Not clear
Depend on case
其他


Line 22 :Process change_Change in the test, risk higher

Clear
Not clear
Depend on case
其他


Line 23 :Process change_Change in testing or test method. Risk unchanged or reduced

Clear
Not clear
Depend on case
其他


Line 24 :Process change_Expansion of the test without changing the method (e.g. increase in random sample)

Clear
Not clear
Depend on case
其他



Line 24a :Process change_Reduction/ cancellation of a not customer relevant testing (e.g. random sample)

Clear
Not clear
Depend on case
其他


Line 25 :Process change_Relocation of Tools within similar lines

Clear
Not clear
Depend on case
其他


Line 26 :Process change_Relocation of non-mobile equipment in a location without changing the process chain

Clear
Not clear
Depend on case
其他


Line 26a :Process change_Relocation of mobile equipment in a location without changing the process chain

Clear
Not clear
Depend on case
其他


Line 27 :Process change_Change in the location, relocation of the equipment, parallel production

Clear
Not clear
Depend on case
其他


Line 27a :Process change_Change in the location, relocation of the equipment, parallel production for roughing stages

Clear
Not clear
Depend on case
其他


Line 28 :Logistics change_New supplier, new sub-supplier-affect contract s(e.g., specification sheet, customer drawing, offer drawing, TCD, data records, specifications, ...) or other serial s provided to the customer (e.g., Control Plan, ...)

Clear
Not clear
Depend on case
其他


Line 29 :Logistics change_New supplier, new sub-supplier-affect fit, form, function, performance, reliability

Clear
Not clear
Depend on case
其他


Line 30 :Logistics change_New supplier, new sub-supplier-no affect

Clear
Not clear
Depend on case
其他


Line 30a :Logistics change_New forwarding agent (carrier), external service provider, internal service provider

Clear
Not clear
Depend on case
其他


Line 31 :Logistics change_Packaging to the customer, shipping, billing

Clear
Not clear
Depend on case
其他


Line 31a :Logistics change_Internal packaging (e.g. plant-plant, within plant,…) and delivered packaging

Clear
Not clear
Depend on case
其他


Line 32 :Documents change_Document adaptation to the condition of the released product

Clear
Not clear
Depend on case
其他


Line 33 :Documents change_Document adaptation to the condition of the released product or correction of formal error (ECR-correction)

Clear
Not clear
Depend on case
其他


Line 34 :Documents change_Change in non-product-related s (e.g. from work instructions, accurate manufacturing instruction)

Clear
Not clear
Depend on case
其他
Line 35 :Re-use of tools after 12 or more months standstill
Clear
Not clear
Depend on case
其他
Line 36 : Servicing/maintenance of existing tools or fast wearing tools
Clear
Not clear
Depend on case
其他
Line 37 :Change in compiler version, Changing SW-tool without effect on customer-SW (Change in the debugger is not relevant here)
Clear
Not clear
Depend on case
其他
Line 38 :Exchange with identical machine or with machine with identical process core, interchanging identical testing device
Clear
Not clear
Depend on case
其他

44题 | 被引用0次

使用此模板创建